Noble House Norlyn 66.9" S-Curved Loveseat Sofa, Chenille Compression Modular Couch, Living Room, Small Space, Brown

★★★★★ 4.8 145 reviews

US$162.80
Price when purchased online
Free shipping Free 30-day returns

Sold and shipped by barkpointventures.com
We aim to show you accurate product information. Manufacturers, suppliers and others provide what you see here.
US$162.80
Price when purchased online
Free shipping Free 30-day returns

How do you want your item?
You get 30 days free! Choose a plan at checkout.
Shipping
Arrives Sep 1
Free
Pickup
Check nearby
Delivery
Not available

Sold and shipped by barkpointventures.com
Free 30-day returns Details

Product details

Management number 237918743 Release Date 2026/07/11 List Price US$162.80 Model Number 237918743
Category

<p>Designed for modern apartments and mindful living spaces, this S-curved loveseat blends comfort with artistic appeal. Its half-circle shape creates a soft, flowing silhouette that stands out while remaining functional. The dual-depth seating design, paired with 30D high-density sponge padding, delivers balanced support for two people during daily use. Upholstered in smooth chenille fabric, the loveseat offers a soft touch and neutral tone that complements minimalist, zen, or meditation-inspired interiors. Its full compression sponge construction removes the need for assembly, allowing quick and effortless setup. Compact in size yet visually impactful, it fits comfortably in small apartments, home offices, or lounge areas. Pair two units together to create a complete yin-yang pattern for a unique decorative statement. This loveseat provides reliable comfort, thoughtful design, and flexible styling for modern, space-conscious homes.</p>

  • Noble House Norlyn 66.9" S-Curved Loveseat Sofa, Chenille Compression Modular Couch, Living Room, Small Space, Brown:
  • Includes: One (1) Loveseat Sofa
  • Material: Chenille + Foam
  • Modern Design: S-curved half-circle shape offers visual and symbolic appeal.
  • Dual-Depth Seating: Ergonomic structure with 30D sponge for balanced support.
  • No Assembly Required: Ready-to-use compression design saves time and effort.
  • Compact & Versatile: Ideal for small apartments, studios, or meditation spaces.
  • Dimensions: 66.90" L x 40.20" W x 25.60" H
  • Weight Capacity: 400 lbs
  • Assembly Not Required
Color Brown
Seating capacity 2
Dimensions 40.20 x 66.90 x 25.60 in
Fabric material name Chenille
Fill material Foam
Sofa & loveseat design Lawson
Assembly req N
Max load 400 lb
Features Multifunctional
Seat depth 26.8 in
Seat height 14.13 in
Seat width 55 in
Decor style Contemporary
Brand Noble House
Pattern Solid Color
Care and maint To preserve the quality and appearance of this item, we recommend gently wiping it clean with a soft, dry cloth as needed.
Leg material Chenille + Foam
Seat color Brown
Leg color Brown
Recommended location Indoor
Bed size Non-Standard
Arm style Round Arms
Seat back height 9.1 in
Arm height 23.23 in
Assembled product weight 51.9 lb
Seat back thickness 9.06 in
Age group Adult
Theme None
Total count 1
Upholstered Y
Suggested number of people for assembly 2
Fabric material percentage 100
Items included One (1) Loveseat Sofa

Correction of product information

If you notice any omissions or errors in the product information on this page, please use the correction request form below.

Correction Request Form

Customer ratings & reviews

4.8 out of 5
★★★★★
145 ratings | 59 reviews
How item rating is calculated
View all reviews
5 stars
87% (126)
4 stars
2% (3)
3 stars
1% (1)
2 stars
0% (0)
1 star
10% (15)
Sort by

There are currently no written reviews for this product.